Load Bearing Improvements for the Ferrazo Pier at the Port of Vilagarcía

Load Bearing Improvements for the Ferrazo Pier at the Port of Vilagarcía de Arousa The works carried out to improve the load-bearing capacity of the Ferrazo pier at the Port of Vilagarcía included: analysis of available documentation; proposal of viable alternatives; analysis, selection, and technical…

Continue reading →

Twelve Dependent Ports in the Central Area

Twelve Dependent Ports in the Central Area The scope of the works completed by CIMARQ in the Portos de Galicia’s Central Area included: Analysis of the current situation of anchoring and entrance channels, assessment of the situation, drafting a report on entrance channels and anchoring….

Continue reading →

Miño River General Collector Pipes in Lugo

Miño River General Collector Pipes in Lugo N-VI-EDAR Section Analysis of the current state of Lugo’s general collector pipes on the Miño river, between national highway VI and the new wastewater treatment plant; proposal of viable alternatives; selection of a technically appropriate proposal; and design…

Continue reading →

Sar River General Collector Pipe/Interceptor

Sar River General Collector Pipe/Interceptor Pontepedriña-Ponte San Lázaro Section The work carried out by CIMARQ included: analysis of the current state of the Sar river general collector pipe in Santiago de Compostela, between Pontepedriña and San Lázaro: preliminary works, technical reports, proposal of viable alternatives,…

Continue reading →

Hyper-Tower for Collecting Solar Energy

Hyper-Tower for Collecting Solar Energy The scope of our work on the Hyper-Tower for collecting solar energy consisted or proposing structural alternatives; selecting, developing and optimizing the selected solution; generating 3D BIM models and animated visualizations. Customer: MSFPA Scope of the works: Structural optimization. BIM…

Continue reading →

Structures under Construction

Structures under Construction Inspections and structural pathology reports. We have prepared multiple structural pathology reports and studies for buildings and civil works under construction. These reports and studies have helped avoid accidents and the additional cost of unnecessary demolition works. Customers: Multiple customers Scope of…

Continue reading →

General Sanitation of the Louro River Basin

General Sanitation of the Louro River Basin Our work on the General Sanitation of the Louroriver basin (Caselas Council) included: Definition of spillway and pumping stations, structural design and optimization. Customer: OHL Owner: Hydrographic Confederation of the North / Hydrographic Confederation of the Miño. Scope…

Continue reading →

Sanitation for the Adai and Orbazai Parishes (Lugo)

Sanitation for the Adai and Orbazai Parishes (Lugo) The scope of our work includes: improvement, replacement and renewal of the supply network for the Adai and Orbazai parishes, municipal district of Lugo. Complete construction project. Customer: Lugo Council Owner: Lugo Council Scope of the works:…

Continue reading →

Drainage Study for the Sar River Basin

Drainage Study for the Sar River Basin where it is Crossed by the AG-11 Barbanza Highway in Dodro Comprehensive drainage study for the Sar river basin in Dodro, where it is crossed by the Barbanza expressway (AG-11). Compilation, review and analysis of available basin information,…

Continue reading →

Lomas del Colmenar Urbanization, 2nd Stage, Ceuta

Lomas del Colmenar Urbanization, 2nd Stage, Ceuta Hydraulic and structural reports and expert advice; determining the hydraulic capacity of the stream’s vaulting at Las Colmenas, Ceuta; Hydrologic model. Customer: Vías y Construcciones S.A. Owner: SEPES. Scope of the works: Hydraulic and structural report and expert…

Continue reading →

Page 4 of 4 1 2 3 4