4000 Ton Silo at the Matsa Factory in Narón

4000 Ton Silo at the Matsa Factory in Narón For this 4000 ton silo at the MATSA factory in Narón, CIMARQ performed the initial requirements analysis, proposed different alternatives, provided technical assistance in the final selection process, developed the selected proposal, generated the corresponding structural…

Continue reading →

New Cement Factory in Aït Baha (Morocco)

New Cement Factory in Aït Baha (Morocco) The work carried out by CIMARQ at the Aït Baha cement factory in Morocco included:  structural design of  hopper buildings and palletizing facilities.  Customer: Martínez Segovia, Fernández, Pallas y Asociados Ingeniería y Arquitectura S.A. Owner: Ciments du Maroc. Scope of…

Continue reading →

New Cement Factory in Tuban (Indonesia)

New Cement Factory in Tuban (Indonesia) The works we have been carrying out at the cement factory in Tuban, Indonesia include: structural design of conveyor 5E1.BG01, supporting structure for conveyor belt CN1.BC02 from tower tt6 to tower tt7, supporting structure for conveyor belt CN1.BC03, structural…

Continue reading →

Lagares Wastewater Treatment Plant (Vigo – Spain)

Lagares Wastewater Treatment Plant (Vigo) The works we have carried out at the Lagares wastewater treatment plant (Vigo) include the provision of technical assistance for affected services, structural analysis of the foundations: containment structures and estimation of foundation loads, structural design of the pre-treatment facilities,…

Continue reading →

A Coruña walkways structural rehabilitation

Project Management of structural rehabilitation of 16  pedestrian walkways  in La Coruna The work we are carrying out includes: General inspection of the 16 walkways in the city of A Coruña, data collection and analysis of their current situation, structural diagnosis, proposed treatments for each…

Continue reading →

Hyper-Tower for Collecting Solar Energy

Hyper-Tower for Collecting Solar Energy The scope of our work on the Hyper-Tower for collecting solar energy consisted or proposing structural alternatives; selecting, developing and optimizing the selected solution; generating 3D BIM models and animated visualizations. Customer: MSFPA Scope of the works: Structural optimization. BIM…

Continue reading →