Rehabilitation of the Stilling Basin in “Fuente de Azufre” Dam (Leon – Spain)

For this highly specialized rehabilitation project of a deeply damaged structure, CIMARQ performed the initial requirements analysis, proposed different alternatives, provided technical assistance, developed the selected proposal, generated the corresponding structural and geotechnical models, prepared the construction project and developed the technical support during the…

Continue reading →

Palmeiro Wastewater Treatment Plant in Xove (Lugo)

Palmeiro Wastewater Treatment Plant in Xove (Lugo) Construction project including infrastructure, technological processes, equipment and operation for the 5000 heq. wastewater treatment plant in Xove, Lugo. Complete construction project, structural and hydraulic optimization, definition and development of the purification process, equipment specification. Technical assistance during…

Continue reading →

Lagares Wastewater Treatment Plant (Vigo – Spain)

Lagares Wastewater Treatment Plant (Vigo) The works we have carried out at the Lagares wastewater treatment plant (Vigo) include the provision of technical assistance for affected services, structural analysis of the foundations: containment structures and estimation of foundation loads, structural design of the pre-treatment facilities,…

Continue reading →

General Sanitation for Ourense

General Sanitation for Ourense Right Bank of the Miño River Our work included: improvement, replacement and renewal of the sewerage network between Eiras Vedras and Tarascón, in the municipal district of Ourense. Definition and optimization of spillways and pumping stations, design and optimization of special…

Continue reading →

General Sanitation for Santiago de Compostela

General Sanitation for Santiago de Compostela Pontepedriña-Ponte San Lázaro Section Analysis of the current situation of the General Sanitation System in Santiago de Compostela between Pontepedriña and San Lázaro, proposal of viable alternatives, selection of the most technically appropriate proposal, and design of the proposed…

Continue reading →

Miño River General Collector Pipes in Lugo

Miño River General Collector Pipes in Lugo N-VI-EDAR Section Analysis of the current state of Lugo’s general collector pipes on the Miño river, between national highway VI and the new wastewater treatment plant; proposal of viable alternatives; selection of a technically appropriate proposal; and design…

Continue reading →

Sar River General Collector Pipe/Interceptor

Sar River General Collector Pipe/Interceptor Pontepedriña-Ponte San Lázaro Section The work carried out by CIMARQ included: analysis of the current state of the Sar river general collector pipe in Santiago de Compostela, between Pontepedriña and San Lázaro: preliminary works, technical reports, proposal of viable alternatives,…

Continue reading →

General Sanitation of the Louro River Basin

General Sanitation of the Louro River Basin Our work on the General Sanitation of the Louroriver basin (Caselas Council) included: Definition of spillway and pumping stations, structural design and optimization. Customer: OHL Owner: Hydrographic Confederation of the North / Hydrographic Confederation of the Miño. Scope…

Continue reading →

Sanitation for the Adai and Orbazai Parishes (Lugo)

Sanitation for the Adai and Orbazai Parishes (Lugo) The scope of our work includes: improvement, replacement and renewal of the supply network for the Adai and Orbazai parishes, municipal district of Lugo. Complete construction project. Customer: Lugo Council Owner: Lugo Council Scope of the works:…

Continue reading →

Drainage Study for the Sar River Basin

Drainage Study for the Sar River Basin where it is Crossed by the AG-11 Barbanza Highway in Dodro Comprehensive drainage study for the Sar river basin in Dodro, where it is crossed by the Barbanza expressway (AG-11). Compilation, review and analysis of available basin information,…

Continue reading →

Page 1 of 2 1 2