VIGO WWTP /Waste Water Treatment Plant)
CIMARQ developed the construction project for the civil works of the WWTP in close collaboration with the different stakeholders.
In 2019, the project received the San Telmo prize, awarded by the Association of Civil Engineers of Galicia.
We have optimised the structures, foundations and construction processes, always keeping in mind the operation of the installations and adapting the project to the needs of the erection works and the variations in the equipment to be installed.
We have also developed the studies needed to optimise the foundations by means of hydrogeological, geotechnical and structural models.
CIMARQ has used the BIM methodology in its designs, being a pioneer in this type of projects.
Client: UTE Lagares (ISOLUX CORSAN – OHL).
Owner: ACUAES
Scope:
- Optimization of the civil works project.